{"id":996,"date":"2024-09-19T12:58:21","date_gmt":"2024-09-19T12:58:21","guid":{"rendered":"https:\/\/kmg.ee\/katenditood\/uncategorized\/avasime-parnus-paikesepargi\/"},"modified":"2026-08-28T12:20:38","modified_gmt":"2026-08-28T12:20:38","slug":"we-opened-a-solar-park-in-parnu","status":"publish","type":"post","link":"https:\/\/kmg.ee\/katenditood\/en\/news\/we-opened-a-solar-park-in-parnu\/","title":{"rendered":"We Opened a Solar Park in P\u00e4rnu"},"content":{"rendered":"\n<p class=\"wp-el wp-block-paragraph\">Yesterday, KMG O\u00dc opened its first solar park at the Sauga asphalt plant in P\u00e4rnu. The solar park will support asphalt concrete production with solar energy, reduce our carbon footprint and decrease the company\u2019s dependence on fossil fuels.<\/p>\n\n\n\n<p class=\"wp-el wp-block-paragraph\">Covering an area of nearly 4,000 square metres, the solar park has a capacity of 230 kW and includes a battery energy storage system.<\/p>\n\n\n\n<p class=\"wp-el wp-block-paragraph\">We are pleased with the result. In addition to improving efficiency, adopting renewable energy solutions is an important part of being a responsible company and preparing for the future. Solar energy generation aligns well with our asphalt production schedule\u2014production takes place in summer and pauses in winter. This investment will make our operations more competitive in the years ahead.<\/p>\n\n\n\n<p class=\"wp-el wp-block-paragraph\">Thank you to everyone who helped bring our first green energy project to life.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/kmg.ee\/katenditood\/wp-content\/uploads\/2024\/09\/20240918_131825-1200x900.jpg\" alt=\"\" class=\"wp-image-702\" srcset=\"https:\/\/kmg.ee\/katenditood\/wp-content\/uploads\/2024\/09\/20240918_131825-1200x900.jpg 1200w, https:\/\/kmg.ee\/katenditood\/wp-content\/uploads\/2024\/09\/20240918_131825-100x75.jpg 100w, https:\/\/kmg.ee\/katenditood\/wp-content\/uploads\/2024\/09\/20240918_131825.jpg 2016w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>\n\n\n\n<p class=\"wp-el wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yesterday, KMG O\u00dc opened its first solar park at the Sauga asphalt plant in P\u00e4rnu. The solar park will support&#8230;<\/p>\n","protected":false},"author":1,"featured_media":703,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[2],"class_list":["post-996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/posts\/996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/comments?post=996"}],"version-history":[{"count":1,"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/posts\/996\/revisions"}],"predecessor-version":[{"id":1076,"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/posts\/996\/revisions\/1076"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/media\/703"}],"wp:attachment":[{"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/media?parent=996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kmg.ee\/katenditood\/en\/wp-json\/wp\/v2\/categories?post=996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}