Reconstruction of the pumping stations and water treatment plants in the borough of Rakke
Client: Rakke Valla Kommunaalasutus
Construction Period: February 2012- June 2013
Construction Cost: 1 729 020 EUR (ex VAT)
Capacity Information:
- Reconstruction of 2.9km. of drinking water pipeline and construction of 0.3km.
- Reconstruction of 0.5km. of self-flowing sewage pipeline and construction of 1.8km.
- Reconstruction of 1.7km. of pressure sewerage pipeline and construction of 0.5km.
- Reconstruction of two drinking water wellbore pump stations.
- Reconstruction of 2 sewage pumping stations and construction of 3.
- Reconstruction of one wastewater treatment plant.
- Construction and reconnection of water and wastewater connection points for properties.
Other Notes:
Joint tender with Viimsi Keevitus AS