Reconstruction of the Ämari air traffic area
Client: Riigi Kaitseinvesteeringute Keskus
Contract Period: January 2024 – October 2024
Construction Cost: 16 795 000 EUR (ex VAT)
Capacity Information:
- Ämari AFB runway, taxiways, and aprons pavement reconstruction.
- Design and construct rainwater collection systems (F900 load classification of gutters, pumping stations, rainwater, and drainage systems). Design and reconstruction of AGL systems.
- Design and reconstruction of AGL systems.
- Design and construction of runway, taxiways, and apron markings.
Other Notes:
Implementation in a consortium with SIA “8 CBR”.