Reconstruction of the 1st quay of Kuivastu Port
Client: AS Saarte Liinid
Construction Period: March 2009 – June 2010
Construction Cost: 16 566 410 EEK / 1 058 790 EUR (ex VAT)
Capacity Information:
- The length of the interconnection line is 123m.
- The water depth is 5.2m. in front of the quay.
- Covering the bottom of the aquatic area (on a 21m. wide) with concrete slabs.
- Construction of water and electricity supply.
Other Notes:
Main contract.