Muuga Port Industrial Park Railway construction
Client: AS Tallinna Sadam
Construction Period: April 2012 – December 2012
Construction Cost: 2 367 630 EUR (ex VAT)
Capacity Information:
- Reconstruction of connection route No. 8 and track No. 10.
- Construction works of connection route No. 701, also of station sidings no. 702, 705, and 710 with switches no. 4, 705, 706, and 711 with a total length of 1.56 km.
- Electrical centralization of switches No. 705 and 706.
- Excavation works for approximately 79,000 m³ (63,000 m³ for the railway construction and around 16,000 m³ for making drains, trenches, and collectors).
Other Notes:
Procurement reference No.130365