Muuga container terminal extension
Client: AS Tallinna Sadam
Construction Period: July 2008 – July 2010
Construction Cost – 850 000 000 EEK / 54 324 760 EUR (ex VAT)
Capacity Information:
- Construction of an additional territory of 27ha, and a nearly 500m long quayline in the eastern part of Muuga Port.
Capability to handle up to 500 thousand TEU containers.
- The filling of the sea with the quay construction is approx. 202,122 m2, the fill volume is approx. 1,153,000 m3.
- Excavation works approx. 161,100 m2, total excavation volume approx. 575,000 m3.
Other Notes:
Joint tender with Danish companies Per Aarsleff A/S, and Rohde Nielsen A/S.