Residual contamination liquidation in former military and indrustial areas
Client: Keskkonnateabe keskus
Contract Period: April 2011 – October 2012
Construction Cost: 1 128 580 EUR (ex VAT)
Capacity Information:
Execution of waste pollution elimination works in the Miinisadama and Süsta St area. The general goal of the project is the localization of residual pollution that threatens groundwater, prevention of environmental pollution, and elimination of residual pollution.
- Moving contaminated soil, subsequent treatment, or depositing it in an appropriate landfill.
- Demolition of facilities subject to liquidation in polluted areas and handling of generated waste (reuse or disposal).
- Elimination of high vegetation in the area with polluted soil (if necessary).
- Improvement of cleaned areas, and restoration of their good condition.
- Operational implementation of the monitoring system for studies following pollution elimination.
- The total volume of earthworks is approximately 21,000 m3.
The total volume of earthworks is approximately 1000 m3. In addition to this, cleaning of polluted water, liquidation of oil residues, demolition work, and construction of a composting area.
Other Notes:
Joint tender with the Finnish company Biomaa OY, Kesto OÜ, and Epler & Lorenz AS.