Infrastructure for monitoring positions of the Narva River
Client: Politsei- ja Piirivalveamet
Contract Period: August 2023 – September 2024
Construction Cost: 1 745 000 EUR (ex VAT)
Capacity Information:
Other Notes:
- Construction of the infrastructure for monitoring positions (5 pcs)
- Access routes
- Device containers
- Electrical and communication connections
- Dismantling two masts