Improvement of the environmental condition of Tallinn Airport airside area
Client: AS Tallinn Airport
Contract Period: May 2020 – December 2021
Construction Cost: 24 800 000 EUR (ex VAT)
Capacity Information:
- Extension of the apron in the southern area of the airport.
- Installation of rainwater systems, to alleviate excess water problems on the eastern side of the flight area.
- Construction of a drainage system for snow collection areas.
- Upgrading the configuration of the eastern de-icing area to increase runway capacity
- The construction of the aircraft engine testing area, including compliant noise barriers
- Construction of airfield access and perimeter roads, construction of the southern ring road
- Airfield AGL construction and integration into Air traffic control systems (TWR) and navigational systems
- Implementing CAT II compliance of the airport
Other Notes:
Joint tender with Verston Ehitus OÜ.