Design and construction of Järve and Keila transmission substations
Client: Elektrizace zeleznic Praha a..
Construction Period: September 2013 – September 2014
Construction Cost: 752 980 EUR (ex VAT)
Capacity Information:
Design and construction works of new electric railway substation buildings.