Container terminal extension for Transiidikeskuse AS
Client: Transiidikeskuse AS
Construction Period: October 2012 – December 2012
Construction Cost: 150 780 EUR (ex VAT)
Capacity Information:
- Construction of a new pavement of 2500m2.
- Construction of rainwater systems.
- Building a perimeter fence.
- Construction of a barrier.