Constructions of Vinni CHP plant
Client: Vinni Biogaas
Construction Period: December 2011 – December 2012
Construction Cost: 4 085 430 EUR (ex VAT)
Capacity Information:
- Design and construction of biogas production complex and cogeneration plants from manure and mash.
- Capacity to receive nearly 88,000 tons of raw material per year.
- The power of the station is 1.36 MW.
Other Notes:
Implementation of the technology in cooperation with the German company BioConstruct GmbH.