Construction of the Suurupi sewage plant
Client: OÜ Strantum
Construction Period: September 2012 – August 2014
Construction Cost: 4 182 450 EUR
Capacity Information:
- Construction of a sewage treatment plant with a total capacity of 10,000 pe.
- Construction of a sea outfall pipeline of the WTP to the Gulf of Finland.
- Design and construction of the residual waste sludge management system.
Other Notes:
Joint tender with Schöttli Keskonnatehnika AS and AS Viimsi Keevitus.