Construction of Estlink/2 warehouse
Client: Elering AS
Construction Period: July 2013 – December 2013
Construction Cost: 193 870 EUR (ex VAT)
Capacity Information:
- Construction of a warehouse with walls made of light panels with a steel-bearing structure and a roof made of light panels with a single slope.
Rectangular plan, axial dimensions of 7.1x 23.0m., and a height of 5m.
- Construction of a lift gate at either end of the warehouse.