KMG Infra OÜ has been entrusted with the largest designs and construction works of infrastructure objects.
Vana-Lõuna tram depot traffic and standing areas
Client: Tallinna Linnatransport Contract Period: March 2024 – June 2025 Construction Cost: 3 700 000 EUR (ex VAT) Capacity Information:
The railway structures of Rail Baltica Ülemiste terminal
Client: Rail Baltic Estonia OÜ Contract Period: April 2023 – February 2027 Construction Cost: 44 829 200 EUR (ex VAT) Capacity Information: Other…
Infrastructure for monitoring positions of the Narva River
Client: Politsei- ja Piirivalveamet Contract Period: August 2023 – September 2024 Construction Cost: 1 745 000 EUR (ex VAT) Capacity Information: Other Notes:
The observation tower of the training field of the Defence Forces
Client: Riigi Kaitseinvesteeringute Keskus Contract Period: August 2023 – April 2024 Construction Cost: 3 470 000 EUR (ex VAT) Capacity Information:
The Rail Baltica Soodevahe infrastructure, phase I
Client: Rail Baltic Estonia OÜ Contract Period: September 2023 – December 2024 Construction Cost: 4 616 000 EUR (ex VAT) Capacity…
Reconstruction of the Ämari air traffic area
Client: Riigi Kaitseinvesteeringute Keskus Contract Period: January 2024 – October 2024 Construction Cost: 16 795 000 EUR (ex VAT) Capacity Information:…
Design and construction of a tram line connecting Vanasadama and Rail Baltic’s Ülemiste passenger terminal
Client: Urban Environment and Public Works Department Contract Period: August 2022- February 2025 Contract Cost: 36 496 170 EUR (ex VAT)…
Client: Urban Environment and Public Works Department