KMG Infra OÜ has been entrusted with the largest designs and construction works of infrastructure objects.
Vana-Lõuna tram depot traffic and standing areas
Client: Tallinna Linnatransport Contract Period: March 2024 – June 2025 Construction Cost: 3 700 000 EUR (ex VAT) Capacity Information:
The railway structures of Rail Baltica Ülemiste terminal
Client: Rail Baltic Estonia OÜ Contract Period: April 2023 – February 2027 Construction Cost: 44 829 200 EUR (ex VAT) Capacity Information: Other…
The observation tower of the training field of the Defence Forces
Client: Riigi Kaitseinvesteeringute Keskus Contract Period: August 2023 – June 2025 Construction Cost: 2 850 000 EUR (ex VAT) Capacity Information:
Design and construction of a tram line connecting Vanasadama and Rail Baltic’s Ülemiste passenger terminal
Client: Urban Environment and Public Works Department Contract Period: August 2022- February 2025 Contract Cost: 36 496 170 EUR (ex VAT)…
Client: Urban Environment and Public Works Department