As years of experience, we have contributed to the renewal and modernization of Estonian infrastructures.
Kopli 16 apartment building with commercial premises
Total of 15 apartments and 4 commercial premises on the first floor.
Client: Lumi Capital OÜ / LC2
November 2016 – December 2017
Reconstruction of the Kalevi Sports Center
During the renovation works all the remaining structures will be reconstructed and new structures will be built taking into account for features needed in the sports hall.
Client: Tallinna Spordihall
Period: 2016
Design-construction works of new tramway to Tallinn Airport
New tramway from Ülemiste railway station area to airport will be constructed
Client: Tallinna Linnatranspordi AS
03.11.2015 - 15.11.2017
Construction of the pedestrian tunnel of Rummu Road
Total length of tunnel – 91m including closed section 20,5m
Client: Pirita Sportscenter
Deadline: 09.09.2015
Construction of quay no. 16 of Vanasadama
A concrete shore ramp (measuring 31×28,5m) founded on steel tube piles will be built the ramp has adjustable steel structure. The ramp will be used for loading and off-loading of vehicles from ships.
Client: AS Tallinna Sadam
Deadline: 01.06.2015
Design and reconstruction of the infrastructure of Tallinn tram line No. 4
Client: Tallinna Linnatranspordi AS Construction Period: January 2014 – November 2015 Construction Cost: 26 000 000 EUR (ex VAT) Capacity Information: Other Notes: The…
Client: Tallinna Linnatraspordi AS
January 2014 - October 2015
Design and construction of Järve and Keila transmission substations
Design and construction of the new electric railway substations buildings.
Client: Elektrizace zeleznic Praha a..
September 2013 - September 2014
Residual contamination liquidation in former military and indrustial areas
Residual contamination liquidation works execution at Holstre-Nõmme ABT and Umbsaare ABT areas.
Client: Keskkonnateabe Keskus
March 2013 - March 2015
Construction of the Suurupi sewage plant
Construct a water treatment plant with a total capacity 10 000 IE. Graduates from the sludge handling system.
Client: OÜ Strantum
September 2012 - March 2015
Container terminal extension for Transiidikeskuse AS
2500m² of new pavement, drainage systems, perimeter fence, guardrails
Client: Transiidikeskuse AS
October - December 2012
Construction of Estlink/2 warehouse
Warehouse has a steel supporting structure with Sandwich panels in the walls and one-sided slope roof with also Sandwich panels.
Client: Elering AS
July - December 2013
Contaminated soil treatment and purification
Client: Keskkonna Teabekeskus
September 2012 - March 2014