As years of experience, we have contributed to the renewal and modernization of Estonian infrastructures.
Construction of Rail Baltica eco duct in Saustinõmme
Client: Rail Baltica Estonia OÜ Contract Period: April 2022 – August 2023 Construction Cost: 3 399 099 EUR (ex VAT) Capacity Information:Wildlife…
Client: Rail Baltica Estonia OÜ
Cooling station for Ülemiste City campus
Client: AS Utilitas Tallinn Contract Period: November 2021- September 2022 Construction Cost: 2 795 200 EUR (ex VAT) Capacity Information:
Client: AS Utilitas Tallinn
November 2021 - September 2022
Pedestrian road between Viljandi and Pärnu highway and tunnels
Client: Tallinn Environment and Municipal Board Contract Period: January 2021 – November 2021 Construction Cost: 2 666 666 EUR (ex VAT) Capacity Information:
Client: Tallinna Keskonna- ja kommunaalamet
Veebruar 2021 - November 2021
Construction of foundation and technical facilities for Rapla Air Dome
Client: Rapla rural municipality Contract Period: September 2021 – December 2021 Construction Cost: 646 646 EUR (ex VAT) Capacity Information:…
Improvement of the environmental condition of Tallinn Airport airside area
Client: AS Tallinn Airport Contract Period: May 2020 – December 2021 Construction Cost: 24 800 000 EUR (ex VAT) Capacity Information: Other…
Client: AS Tallinna Lennujaam
June 2020 – December 2021
Construction of Reidi Road in Tallinn
Reidi road construction complete solution.
Client: Tallinn Municipal Service Department
June 2018 – December 2019
Residual contamination liquidation in former military and indrustial areas
Contaminated soil excavation and handling of 31 000 m3 total
Client: Keskkonnaministeerium
October 2017 – November 2018
Kopli 16 apartment building with commercial premises
Total of 15 apartments and 4 commercial premises on the first floor.
Client: Lumi Capital OÜ / LC2
November 2016 – December 2017
Reconstruction of the Kalevi Sports Center
During the renovation works all the remaining structures will be reconstructed and new structures will be built taking into account for features needed in the sports hall.
Client: Tallinna Spordihall
Period: 2016
Design-construction works of new tramway to Tallinn Airport
New tramway from Ülemiste railway station area to airport will be constructed
Client: Tallinna Linnatranspordi AS
03.11.2015 - 15.11.2017
Construction of the pedestrian tunnel of Rummu Road
Total length of tunnel – 91m including closed section 20,5m
Client: Pirita Sportscenter
Deadline: 09.09.2015
Construction of quay no. 16 of Vanasadama
A concrete shore ramp (measuring 31×28,5m) founded on steel tube piles will be built the ramp has adjustable steel structure. The ramp will be used for loading and off-loading of vehicles from ships.
Client: AS Tallinna Sadam
Deadline: 01.06.2015