Movable pedestrian’s bridge at the Old Port of Tallinn sis officially opened.
KMG Inseneriehituse AS board member, Mr Indrek Pappel, stated that building such a unique bridge presented a serious challenge and required very high level project management both in communications with partners from abroad as well as in solving cross border logistical issues, in order to complete the bridge in its current configuration. The technical solution employed allows the closing and opening of the bridge within a few minutes and by doing so provides the fastest route between A and D terminals of the Old Port of Tallinn.
The design and construction works took a total of 16 months. KMG Inseneriehituse AS wishes to thank all its cooperation partners for their efforts to make this unique structure a reality.